Description
Privilege Gaia is located between Arcozelo and Vila Nova de Gaia, just 10 kilometers from Porto. This residential area stands out for its natural beauty, surrounded by unique landscapes such as the Ribeira do Espirito Santo boardwalks and Miramar beach, home to the historic Senhor da Pedra Chapel. Nearby is also the Miramar Golf Club, one of the oldest and most prestigious in the country.
Typology: T3
Interior Area: 179.23 m²
Gross Area: 266.76 m²
Outdoor Area: 139.91 m²
Orientation: East, West
Garage: Space for 2 vehicles
The development is located in a consolidated area, with essential services just a few minutes' drive away and excellent access to main roads and public transport, including trains, ensuring an easy connection to Porto.
Privilege Gaia reflects the essence of minimalism, with a simple and elegant design, straight lines, and neutral tones that harmonize with the surrounding natural setting, creating spacious and bright environments.
The project offers 16 exclusive villas, of which 9 are still available. Each villa has a private garden, balconies with large windows, three bedrooms, an independent laundry room, storage space, and private parking.
High-quality finishes:
Reinforced concrete structure with solid slabs
Facade in large-format ceramic cladding and exposed concrete
Anodized aluminum window frames with thermal break and double glazing
Interior flooring in glued noble wood
White lacquered MDF full-height interior doors
High-security entrance door
Built-in wardrobes with lacquered doors and melamine interiors
False ceilings with integrated lighting and blackout curtain coves
Kitchens with water-resistant MDF furniture and Silestone 'Pearl Jasmine' countertops
Siemens appliances included
Bathrooms with Roca fixtures, Hansgrohe mixers, and Roca shower trays
Heating and cooling with Daikin heat pump
Electric towel warmers in bathrooms
Video intercom and integrated lighting/blind control
Pre-installation for electric vehicle charging
Infrastructure prepared for future pool installation
Payment terms:
CPCV: 5%
Start of construction: 10%
Structure: 10%
Window frames: 10%
Deed: 65%
Construction expected to begin by September 2025. Estimated duration: 24 months, with completion and deed scheduled for 30 months after the start.
MetaHome - Luxury Real Estate
Your home with a view to the future.
AMI License No. 21080
Energy Rating: A+