Description
Fraction V M1. A5V T3 lot 1 block A floor 5 T3. tr. dr ORIENTATION E/S AREA 136.8 EXTERIOR 23.8 TOTAL 160.5 PARKING: 2PLACE P. 17. D AREA 25.4 FLOOR -1 STORAGE: 2PLACE P. 17. D AREA 25.4 FLOOR -1 Timelines and Conditions: The deadline for M1,sqm, M3 and M4 is 33 months for the construction. Conditions: 20% Sign; 10% Ref Sign with the completion of the reinforced concrete structure; 10% Ref Sign with the framing; Remaining in the deed. (OP-013007025)