Description
A1B_T3 LOTE 2 BLOCK FLOOR 1 (RC) T3. fr. eq ORIENTATION- W/N AREA 127.3 EXTERIOR 182.7 TOTAL 310.0 PARKING: 2PLACE P. 76_P. 77AREA 25.8 FLOOR -2 STORAGE: A. 55 AREA 3.4 FLOOR-2 PAYMENT CONDITIONS: The deadline for M1,sqm, M3 and M4 is 33 months for the construction. Conditions: 20% Sign; 10% Ref Sign with the completion of the reinforced concrete structure; 10% Ref Sign with the framing; Remaining in the deed. (OP-013007100)