Description
ORIENTATION-W/E AREA-135,7 EXTERIOR 22,2 TOTAL 157,9 PARKING: 2 PLACES- P. 27-P. 28 AREA- 26,0 FLOOR-1 STORAGE: BLOCK A. 24 AREA-6,6 FLOOR-1 PAYMENT CONDITIONS: The deadline for M1,sqm, M3 and M4 is 33 months for the construction. Conditions: 20% Sign; 10% Ref Sign with the completion of the reinforced concrete structure; 10% Ref Sign with the framing; Remaining in the deed. (OP-013007105)