Description
FLOOR 5 4TH FLOOR FRAÇÃO AO LOTE 2 BLOCO C T3. tr. dr ORIENTAÇÃO-S/E AREA-133,6 EXTERIOR-36,2 TOTAL-169,8 PARKING: 2 PLACES P. 70 P. 71- P. AREA- 26,3 FLOOR-2 STORAGE: A. 52 AREA- 6,7 FLOOR-2 PAYMENT CONDITIONS: The deadline for M1,sqm, M3 and M4 is 33 months for the construction. Conditions: 20% Sign; 10% Ref Sign with the completion of the reinforced concrete structure; 10% Ref Sign with the framing; Remaining in the deed. (OP-013007106)