Description
ORIENTATION-E/W AREA-181,2 EXTERIOR-82,4 TOTAL-263,6 PARKING: 2PLACE P. 12/P. 13 AREA 28,6 FLOOR-1 STORAGE: A. 2/A. 3AREA- 7,5 FLOOR-1 PAYMENT CONDITIONS: The deadline for M1,sqm, M3 and M4 is 33 months for the construction. Conditions: 20% Sign; 10% Ref Sign with the completion of the reinforced concrete structure; 10% Ref Sign with the framing; Remaining in the deed. (OP-013007107)