Description
FRACCIONE A FLOOR 1 LOTE 2 BLOCK A T3. tr. eq SOLAR EXPOSURE E/N ABC 136,0 EXTERIOR 115,0 TOTAL 251,0 PARKING: 2PLACE P. 47/P. 48 ´AREA 28,5 FLOOR -2 STORAGE: A. 36/A. 37 AREA 7,4 FLOOR -2 PAYMENT CONDITIONS: The deadline for M1,sqm, M3 and M4 is 33 months for the construction. Conditions: 20% Sign; 10% Ref Sign with the completion of the reinforced concrete structure; 10% Ref Sign with the framing; Remaining in the deed. (OP-013007099)