Description
Fraction R M1. A4R- T3 lot1 block A floor 4 T3. tr. dr ORIENTATION E/S AREA-136.8 EXTERIOR-23.8 TOTAL 160.6 PARKING: 2 PLACES P. 13. D AREA 32.3 FLOOR -1 STORAGE: A. 08 AREA 5.7 FLOOR-1 Timelines and Conditions: The deadline for M1,sqm, M3 and M4 is 33 months for the construction. Conditions: 20% Sign; 10% Ref Sign with the completion of the reinforced concrete structure; 10% Ref Sign with the framing; Remaining in the deed. (OP-013007021)