Description
In a private and quiet location, just minutes from the wonderful beaches of Budoni, we offer a newly built villa made with quality materials and advanced construction techniques, designed to offer maximum comfort in every season.
The property is on two levels: the mezzanine floor is accessed by a covered veranda overlooking the pool, ideal for enjoying outdoor evenings. The living-dining room is large and bright, connected to a generously sized kitchen. On the same level we find a bathroom and a large double bedroom.
In the basement we find three large bedrooms, three bathrooms and a convenient laundry room. An ideal solution for hosting guests or for those looking for well-distributed space for a large family.
Outside, the villa is surrounded by a large private garden with central irrigation system and lighting. The swimming pool has an area of about 40 square meters, with depth varying from 80 to 140 cm, equipped with a motor and filter system, local stone paving and outdoor shower with hot and cold water. There is also a brick barbecue, perfect for outdoor dining.
Construction and technical features:
- Standard load-bearing concrete block walls, using Isotex blocks for insulation, certified for energy conservation
- Mixed brick floor slab with exposed wood beam roofing
- PVC exterior window frames with safety glass, in the color agreed between the parties
- Cladding of some exterior walls in local stone or granite arranged in mosaic pattern
- Fencing in local stone, with galvanized iron entrance gate
- Two parking spaces finished with paving or self-locking tiles
- 3000-liter water reserve with submersible pump
- Provision for air conditioning systems (dual and trial split)
The villa represents a perfect combination of comfort, energy efficiency and aesthetic care, located in a residential area with strong potential, ideal both as a main residence and as a summer residence or investment.
It should be noted that the start of construction is scheduled for February 2026 and the end of construction is scheduled for July 2027.