Wersja przeglądarki nie jest już obsługiwana. Zaktualizuj, aby uzyskać lepsze wrażenia.

41

Vila Nova de Gaia, Distrito do Porto : sprzedaż luksusowego apartamentu

₽ 52 369 900
119 m² 2 2

PODOBA CI SIĘ?

Opis

The development consists of four five-storey buildings, plus the Recuado. In total, there are 157 flats, with types ranging from 1 to 5 bedrooms. All the flats are equipped with full kitchens and spacious balconies offering panoramic views.
Some of the flats have private terraces with a swimming pool or jacuzzi. These additional features provide residents with an experience of exclusive luxury and comfort.

The Marina Douro Project has been designed to offer all the essential elements for comfortable family living. Residents will have access to a garden and children's playground common to all the buildings, promoting a greater spirit of community and conviviality among families. In addition, all the flats include private parking spaces in their own building's garage.
The first phase of the development is Marina Douro 1, which has 26 flats.

The fraction in question has the following characteristics:

- Open-plan living, dining and kitchen area of 47.1 m2;
- One bedroom with 13.9 m2;
- A 16.5 m2 suite with a 5.9 m2 bathroom;
- Bathroom with 3.00 m2;
- Balcony with 22,0 m2 and
- Parking space of 13.4 m2 and storage room of 6.5 m2.


Located :
- 2 Km from the supermarket,
- 2 Km from Arrabida Shopping Centre,
- 2 Km from the pharmacy,
- 15 Km from Porto Airport
- 2.5 Km from Oporto

Technical Features:
- Floors in the hall, living room, kitchen and bedrooms in oak wood, multi-layered with a final layer in noble wood;
- False ceilings in 13 mm thick plasterboard
- Walls in 'Seral' type projected stucco
- Interior wardrobes in linen melamine, doors in MDF
- Water-repellent MDF skirting boards
- Heating and cooling by multi-split system with indoor wall units
- Sanitary water heating by heat pump
- Video intercom
- Private car park with access to the basement via automatic gate with
remote control
-Bins on the pavement accessing the development for the selective collection of
collection of undifferentiated solid waste, glass, paper and packaging
-Condominium lounge
-Landscaped outdoor area with children's playground, seating and leisure areas,.
water feature and wooden walkways.

Construction is expected to take 30 months and start in May 2024.
Energy Rating: A

500

SZCZEGÓŁY

Pokoje
2
Sypialnie
2
Łazienki
2
Powierzchnia wewnętrzna
119 m²
Klasa Energetyczna
A
Kod
0230/24
Winda
Tak

Odkryj więcej

PODOBA CI SIĘ?